Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Integrating Kanban with MRP II : Automating a Pull System for Enhanced JIT Inventory Management
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Integrating Kanban with MRP II : Automating a Pull System for Enhanced JIT Inventory Management
Edition
Call Number
ISBN/ISSN
Author(s) Louis, Raymonsd S.
Subject(s) INVENTORY CONTROL-AUTOMATION
JUST-IN-TIME SYSTEMS
Classification 658.51
Series Title
GMD Buku
Language Inggris
Publisher Productivity
Publishing Year 1997
Publishing Place New York
Collation
Abstract/Notes
Specific Detail Info 1. Eliminating Replenishment System Waste; 2. Replenishment System Basics; 3. Automated Kanban-The Automated Flow Technology; 4. Kanban Prerequisites-WCM Techniques; 5. Implementing Kanban; 6. Kanban and MRP II System Integration; 7. AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels; 8. Perpetuation of the Automated Kanban System; 9. Key Topics of theAutomated Kanban System; 10. three Examples of AFT Implementation
Image
File Attachment
LOADING LIST...
Pembimbing
Volume
Availability
LOADING LIST...
  Back To Previous