RECORD DETAIL
Back To Previous
Back To Previous
Title | Integrating Kanban with MRP II : Automating a Pull System for Enhanced JIT Inventory Management |
Edition | |
Call Number | |
ISBN/ISSN | |
Author(s) | Louis, Raymonsd S. |
Subject(s) | INVENTORY CONTROL-AUTOMATION JUST-IN-TIME SYSTEMS |
Classification | 658.51 |
Series Title | GMD | Buku |
Language | Inggris |
Publisher | Productivity |
Publishing Year | 1997 |
Publishing Place | New York |
Collation | |
Abstract/Notes | |
Specific Detail Info | 1. Eliminating Replenishment System Waste; 2. Replenishment System Basics; 3. Automated Kanban-The Automated Flow Technology; 4. Kanban Prerequisites-WCM Techniques; 5. Implementing Kanban; 6. Kanban and MRP II System Integration; 7. AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels; 8. Perpetuation of the Automated Kanban System; 9. Key Topics of theAutomated Kanban System; 10. three Examples of AFT Implementation |
Image | |
File Attachment | LOADING LIST... |
Pembimbing | |
Volume | |
Availability | LOADING LIST... |
Back To Previous |