RECORD DETAIL
Back To Previous
Back To Previous
| Title | Integrating Kanban with MRP II : Automating a Pull System for Enhanced JIT Inventory Management |
| Edition | |
| Call Number | |
| ISBN/ISSN | |
| Author(s) | Louis, Raymonsd S. |
| Subject(s) | INVENTORY CONTROL-AUTOMATION JUST-IN-TIME SYSTEMS |
| Classification | 658.51 |
| Series Title | GMD | Buku |
| Language | Inggris |
| Publisher | Productivity |
| Publishing Year | 1997 |
| Publishing Place | New York |
| Collation | |
| Abstract/Notes | |
| Specific Detail Info | 1. Eliminating Replenishment System Waste; 2. Replenishment System Basics; 3. Automated Kanban-The Automated Flow Technology; 4. Kanban Prerequisites-WCM Techniques; 5. Implementing Kanban; 6. Kanban and MRP II System Integration; 7. AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels; 8. Perpetuation of the Automated Kanban System; 9. Key Topics of theAutomated Kanban System; 10. three Examples of AFT Implementation |
| Image | ![]() |
| File Attachment | LOADING LIST... |
| Pembimbing | |
| Volume | |
| Availability | LOADING LIST... |
| Back To Previous |
