Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Concurrent Engineering : Shortening Lead Times, Raising Quality, and Lowering Costs
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Concurrent Engineering : Shortening Lead Times, Raising Quality, and Lowering Costs
Edition
Call Number
ISBN/ISSN
Author(s) Hartley, John R.
Subject(s) PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Classification 658.5
Series Title
GMD Buku
Language Inggris
Publisher Productivity Press
Publishing Year 1992
Publishing Place New York
Collation
Abstract/Notes
Specific Detail Info 1. The Need for Change; 2. Quickening Change; 3. The Key to Japanese Success; 4. North American Pioneers; 5. CE in the European Automobile Industry; 6. Management in Control of Product Development; 7. Total Quality Control Becomes a Reality; 8. Concurrent Engineering Enhances Design; 9. Easier Production, Fewer Failures; 10. Robust Products for Manufacture ;…
Image
File Attachment
LOADING LIST...
Pembimbing
Volume
Availability
LOADING LIST...
  Back To Previous