RECORD DETAIL
Back To Previous
Back To Previous
Title | Computers & Industrial Engineering an International Journal |
Edition | |
Call Number | |
ISBN/ISSN | |
Author(s) | Dessouky, Mohamed I. [editor] |
Subject(s) | COMPUTER AND INDUSTRIAL ENGINEERING |
Classification | 03/j/cieij/2003 |
Series Title | GMD | Jurnal |
Language | Inggris |
Publisher | Elsevier |
Publishing Year | 2003 |
Publishing Place | Amsterdam |
Collation | |
Abstract/Notes | |
Specific Detail Info | 1. Flexible 4-day workweek scheduling with weekend work frequency contraints; 2. Evolutionary approuchesto the design and organization of manufacturing systems; 3. Activity time-cost tradeoffs under time and cost change contraints;… |
Image | |
File Attachment | LOADING LIST... |
Pembimbing | |
Volume | |
Availability | LOADING LIST... |
Back To Previous |