RECORD DETAIL
Back To Previous
Back To Previous
| Title | IIE Transactions |
| Edition | Vol 33 November 2001 |
| Call Number | |
| ISBN/ISSN | |
| Author(s) | Daskin, Mark |
| Subject(s) | Logistic Scheduling |
| Classification | 11/iie/2001 |
| Series Title | GMD | Jurnal |
| Language | Inggris |
| Publisher | Kluwer Academic Plubisher |
| Publishing Year | 2001 |
| Publishing Place | Norwell |
| Collation | |
| Abstract/Notes | |
| Specific Detail Info | Scheduling & Logistic : 1. Marketing/manufacturing trade-offs in product line management; 2. The plant location and technology acquisition problem; 3. Scheduling of costumized jobs on a single machine under item availability; 4. Sequencing three-stage flexible flowshop with identical machines to minimize makespan; 5. Economic lot-sizing with remanufacturing options;… |
| Image | ![]() |
| File Attachment | LOADING LIST... |
| Pembimbing | |
| Volume | |
| Availability | LOADING LIST... |
| Back To Previous |
