Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
IIE Transactions
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title IIE Transactions
Edition Vol 36 January 2004
Call Number
ISBN/ISSN
Author(s) Daskin, Mark
Subject(s) Logistic
Scheduling
Classification 01/iie/2004
Series Title
GMD Jurnal
Language Inggris
Publisher Taylor & Francis
Publishing Year 2004
Publishing Place Philadelphia
Collation
Abstract/Notes
Specific Detail Info Scheduling & Logistic : 1. Some results on resource constrained schedulig; 2. Parallel machine scheduling to minimize the sum of quadratic completion times; 3. Technical note: An improved algorithm for solving a multi-period facility location problem; 4. Optimal capacity expansion for multi-product,multi-machine manufacturing systems with stochastic demand; 5. Exact algorithms for the job sequencing and tool switching problem;…
Image
File Attachment
LOADING LIST...
Pembimbing
Volume
Availability
LOADING LIST...
  Back To Previous