Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
IIE Transactions
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title IIE Transactions
Edition Vol 33 January 2001
Call Number
ISBN/ISSN
Author(s) Elsayed,Elsayed
Subject(s) DESIGN & MANUFACTURING
Classification 01/iie/2001
Series Title
GMD Jurnal
Language Inggris
Publisher Kluwer Academic
Publishing Year 2001
Publishing Place Norwell
Collation
Abstract/Notes
Specific Detail Info Design & Manufacturing; 1. One-machine, N-product-type,continuous-time scheduling with a common due date: a polynomially solvable case; 2. A comparison of exixting grouping efficiency measures and a new weighted grouping efficiency measure; 3. Balancing mixed-model assembly lines to reduce work overload; 4. Exact collision detection for a virtual manufacturing simulator; 5. Expected move request waiting times in single-device, polling-based marerial handling systems;…
Image
File Attachment
LOADING LIST...
Pembimbing
Volume
Availability
LOADING LIST...
  Back To Previous