RECORD DETAIL
Back To Previous
Back To Previous
| Title | The Engineering Economicst |
| Edition | |
| Call Number | |
| ISBN/ISSN | |
| Author(s) | Park, Chen S. |
| Subject(s) | ENGINEERING ECONOMY |
| Classification | 382/j/RBTI/1996 |
| Series Title | GMD | Jurnal |
| Language | Inggris |
| Publisher | IIE |
| Publishing Year | 1996 |
| Publishing Place | California |
| Collation | |
| Abstract/Notes | |
| Specific Detail Info | 1. A Metamodal Approach to Sensivity Analysis of Capital Project Valuation (David E. Sartori; Alice E Smith); 2. Evaluation flexible Manufacturing Systems Alternatives Using data Evelopment Analysis (Joseph Sarkins); 3. Capacity Planning with Demand Uncertainy (Bala V. Balachandran;…); 4. Net Present Value When the Firm Is in a Loss Carryforward Position (W.J. Hurley; L.D. Johnson) |
| Image | ![]() |
| File Attachment | LOADING LIST... |
| Pembimbing | |
| Volume | |
| Availability | LOADING LIST... |
| Back To Previous |
