Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Evaluasi Sistem Kontrak Pengadaan Komponen Ban Pada Pesawat Boeing 737-300/400/500 Dengan Pendekatan Weibull Reliability Analysis Serta Penentuan Model Persediaan Periode Tahun 2003 di PT. Garuda Indonesia Jakarta
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Evaluasi Sistem Kontrak Pengadaan Komponen Ban Pada Pesawat Boeing 737-300/400/500 Dengan Pendekatan Weibull Reliability Analysis Serta Penentuan Model Persediaan Periode Tahun 2003 di PT. Garuda Indonesia Jakarta
Edition
Call Number
ISBN/ISSN
Author(s) Doddy Suryajaya
Subject(s) Maintenance
Weibull Reliability Analysis
Classification 658.202
Series Title
GMD Tugas Akhir
Language Indonesia
Publisher Jurusan Teknik Industri FTI-ITS
Publishing Year 2003
Publishing Place Surabaya
Collation
Abstract/Notes
Specific Detail Info
Image
File Attachment
LOADING LIST...
Pembimbing Maria Anityasari, ST.,ME.
Volume 1
Availability
LOADING LIST...
  Back To Previous