RECORD DETAIL
Back To Previous
Back To Previous
Title | Heuristic Scheduling Systems: With Application to Production Systems and Project Management |
Edition | |
Call Number | |
ISBN/ISSN | |
Author(s) | Morton, Thomas E. Pentico, David W. |
Subject(s) | MANAGEMENT PRODUCTION CONTROL Scheduling |
Classification | 658.5'3-dc20 |
Series Title | GMD | Buku |
Language | Inggris |
Publisher | John Wiley and Sons, Inc. |
Publishing Year | 1993 |
Publishing Place | |
Collation | |
Abstract/Notes | |
Specific Detail Info | |
Image | |
File Attachment | LOADING LIST... |
Pembimbing | |
Volume | |
Availability | LOADING LIST... |
Back To Previous |