Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Penjadwalan Mesin Berbasis Proyek (Engineering To Order) dengan Pendekatan Algoritma Priority Dispatching dan Jadwal Non Delay Studi Kasus : Workshop II Divisi PPJ (Produksi Peralatan Jalan) PT. Barata Indonesia (Persero)
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Penjadwalan Mesin Berbasis Proyek (Engineering To Order) dengan Pendekatan Algoritma Priority Dispatching dan Jadwal Non Delay Studi Kasus : Workshop II Divisi PPJ (Produksi Peralatan Jalan) PT. Barata Indonesia (Persero)
Edition
Call Number 2012/II/19
ISBN/ISSN
Author(s) Rosida, Husna
Subject(s) Job shop
Non Delay
Priority dispatching
Classification 658.542 Ros p
Series Title
GMD Tugas Akhir
Language Indonesia
Publisher Jur. Mata Kuliah Umum (MKU)-FMIPA ITS
Publishing Year 2012
Publishing Place Surabaya
Collation 21 cm
Abstract/Notes
Specific Detail Info
Image
File Attachment
LOADING LIST...
Pembimbing Yudha Prasetyawan, ST,M.Eng
Volume
Availability
LOADING LIST...
  Back To Previous