RECORD DETAIL
Back To Previous
Back To Previous
| Title | Penjadwalan Mesin Berbasis Proyek (Engineering To Order) dengan Pendekatan Algoritma Priority Dispatching dan Jadwal Non Delay Studi Kasus : Workshop II Divisi PPJ (Produksi Peralatan Jalan) PT. Barata Indonesia (Persero) |
| Edition | |
| Call Number | 2012/II/19 |
| ISBN/ISSN | |
| Author(s) | Rosida, Husna |
| Subject(s) | Job shop Non Delay Priority dispatching |
| Classification | 658.542 Ros p |
| Series Title | GMD | Tugas Akhir |
| Language | Indonesia |
| Publisher | Jur. Mata Kuliah Umum (MKU)-FMIPA ITS |
| Publishing Year | 2012 |
| Publishing Place | Surabaya |
| Collation | 21 cm |
| Abstract/Notes | |
| Specific Detail Info | |
| Image | |
| File Attachment | LOADING LIST... |
| Pembimbing | Yudha Prasetyawan, ST,M.Eng |
| Volume | |
| Availability | LOADING LIST... |
| Back To Previous |