RECORD DETAIL
Back To Previous
Back To Previous
Title | Perencanaan dan Pengendalian Proyek Konstruksi Menggunakan Critical Chain Project Management dan Lean Construction untuk Meminimasi Waste (studi kasus : Proyek Pembangunan Gedung BPPKB Tahap II) |
Edition | |
Call Number | 2012/II/20 |
ISBN/ISSN | |
Author(s) | Karim, Mohammad Bussyral |
Subject(s) | RCA Lean Construction Project Risk Management Waste |
Classification | 658.542 Kar p |
Series Title | GMD | Tugas Akhir |
Language | Indonesia |
Publisher | Jurusan S1 Teknik Industri FTI-ITS |
Publishing Year | 2012 |
Publishing Place | Surabaya |
Collation | 21 cm |
Abstract/Notes | |
Specific Detail Info | |
Image | |
File Attachment | LOADING LIST... |
Pembimbing | Putu Dana Karningsih,ST,M.Eng.Sc.Ph.D; Ir. Hari Supriyanto, MSIE |
Volume | |
Availability | LOADING LIST... |
Back To Previous |