Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Pengukuran Nilai Overall Equipment Effectiveness(OEE) sebagai Pedoman Perbaikan Efektivitas Mesin CNC Cutting (studi kasus : PT. Alstom Power Energy System Indonesia
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Pengukuran Nilai Overall Equipment Effectiveness(OEE) sebagai Pedoman Perbaikan Efektivitas Mesin CNC Cutting (studi kasus : PT. Alstom Power Energy System Indonesia
Edition
Call Number 2012/II/34
ISBN/ISSN
Author(s) Habib, Agil Septiyan
Subject(s) Overall Equipment Effectiveness
Availability Rate
Classification 658.15 Hab p
Series Title
GMD Tugas Akhir
Language Indonesia
Publisher Jurusan Teknik Industri FTI-ITS
Publishing Year 2012
Publishing Place Surabaya
Collation 21 cm
Abstract/Notes Overall Equipment Effectiveness; Availability Rate; Performance Rate; Root Cause Analysis
Specific Detail Info
Image
File Attachment
LOADING LIST...
Pembimbing Ir. Hari Supriyanto, MSIE
Volume
Availability
LOADING LIST...
  Back To Previous