Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Perbaikan Proses Bisnis pada Divisi Kapal Niaga PT. PAL : Sebuah Pendekatan Proses Berpikir Teori Konstrain
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Perbaikan Proses Bisnis pada Divisi Kapal Niaga PT. PAL : Sebuah Pendekatan Proses Berpikir Teori Konstrain
Edition
Call Number 2013/I/06
ISBN/ISSN
Author(s) Putra, Utario Esna
Subject(s) Improvement
Shipyard
Theory of Constraints
Classification 658.57 Put p
Series Title
GMD Tugas Akhir
Language Indonesia
Publisher Jurusan Teknik Industri FTI-ITS
Publishing Year 2013
Publishing Place Surabaya
Collation 25 cm
Abstract/Notes Keywords: business process, improvement, shipyard, theory of constraints, thinking process
Specific Detail Info PT. X as one of the biggest shipyard is facing a great challenge to keep its existence. One of its division which has the largest production capacity and expected contribution, is Commercial Ship Division. At 2011 it only fulfilled 23,1% of its target, which brought a huge loss to the corporate. That condition presses Commercial Ship Division to manage a continuous improvement in business process. Facing a constrained resources, all effort must be effectively and efficiently carried on. In this research, solution in business process improvement is approached using Theory of Constraints Thinking Process. From Current Reality Tree (CRT) diagram, the model of problem is acquired. Future Reality Tree (FRT) diagram is used to depict how injection influence the improvement. Transition Tree (TT) is assembled to arrange the necessary step for improvement or a road map.
Image
File Attachment
LOADING LIST...
Pembimbing Prof.Ir. Budisantoso W, M.Eng.Ph.D
Volume
Availability
LOADING LIST...
  Back To Previous