Warning: Creating default object from empty value in /var/www/html/rbti/lib/lang/php-gettext/gettext.inc on line 148
Minimizing Deviation Between Production Planning and Actual Production By Using Winter's Forecasting Method (Study Case: PT. Astra Daihatsu Motor )
 
 
 
Select Language
Simple Search
Advanced Search
Title : Author(s) :
  • SEARCHING...
Subject(s) :
  • SEARCHING...
Pembimbing : Publish Year : GMD : Collection Type :
RECORD DETAIL
Back To Previous  
Title Minimizing Deviation Between Production Planning and Actual Production By Using Winter's Forecasting Method (Study Case: PT. Astra Daihatsu Motor )
Edition
Call Number 2014/65
ISBN/ISSN
Author(s) Ghaisani, Nofinda
Andamari, Sindi
Subject(s) Production Planning and Inventory Control
Classification
Series Title
GMD Kerja Praktek
Language Indonesia
Publisher Jurusan Teknik Industri FTI-ITS
Publishing Year 2014
Publishing Place Surabaya
Collation 21 cm
Abstract/Notes
Specific Detail Info
Image
File Attachment
LOADING LIST...
Pembimbing Dewanti Anggrahini,ST,MT, Stephanus Surya
Volume
Availability
LOADING LIST...
  Back To Previous