Web Online Public Access Catalog - Use the search options to find documents quickly
Found 15 from your keywords :
Subject : "TIME STUDY"Query took 0.05975 second(s) to complete
Notice: Undefined index: p in /var/www/html/rbti/template/digitallibrary/index_template.inc.php on line 100
Analisis Jumlah Kebutuhan Tenaga Kebersihan Ruang Terbuka di Institut Tekhnologi Sepuluh Nopember (ITS) Berdasarkan Master Plan Pembangunan ITS tahun 2016-2020
Pembimbing : Dr.Ir. Sri Gunani Partiwi, MT
Publish Year : 2015
Workload Analysis to Determine Number Of Nurse Practitioner And Nursing Assistant In Inpatient Unit, Al-Irsyad Hospital Surabaya
Pembimbing : Arief Rahman, ST,MSc.
Publish Year : 2015
Penentuan Waktu Standar Perawatan Komponen pada Main Wheel, Nose Wheel, dan Steel Brake di Wheel & Brake Shop (Studi Kasus di PT. GMF AEROASIA)
Pembimbing : Nani Kurniati, ST., MT.;Arief Rahman, ST., M.Sc.
Publish Year : 2010
Perancangan Perangkat Lunak Pengukuran Kerja pada Personal Digital Assistant (PDA) dengan Memperhatikan Aspek Usability
Pembimbing : Yudha Prasetyawan, ST., M.Eng.;Nani Kurniati, ST., MT
Publish Year : 2009
Perhitungan kebutuhan Jumlah Pekerja yang Optimal pada Departemen Continuous Flow PT. "X"
Pembimbing : Dr.Ir. Sri Gunani Partiwi, MT
Publish Year : 2014
Workforce Allocation Based On Time Study and Work Balancing (Studi Case: PT. Madusari Mas, Rungkut branch,Surabaya )
Pembimbing : Arief Rahman, ST,MSc.
Publish Year : 2014
Perhitungan Jumlah Tenaga Kerja yang Optimal pada cleaning Pabrik Personal Wash PT. Unilever Indonesia
Pembimbing : Dr.Ir. Sri Gunani Partiwi, MT
Publish Year : 2014
Perancangan Aplikasi Pengukuran Waktu Kerja Langsung dengan Metode Stopwatch Time Study Berbasis Android
Pembimbing : Arief Rahman,ST,MSc.
Publish Year : 2013